Tag: Project sEVen
-

2026-11 Bench Motor Mount
Building a more substantial motor mount for the Project sEVen test bench, using aluminium plate and angle with a 3D-printed drilling and cutting template.
-

2026-11 Bench Update
A November 2026 Project sEVen bench update: connecting the inverter and motor, using AI and Python to test the drivetrain, and preparing for battery-powered testing.
-

2026-11 Gearbox Update
A November 2026 update on the Project sEVen gearbox: the completed 3.5:1 reduction design, the search for manufacturers, and a 3D-printed version.
-

Rewriting My EV’s Vehicle Control Software with an Agentic Workflow
I rewrote my Caterham Seven EV’s vehicle-control software from a clean sheet using ChatGPT Codex. Here’s what the system now does, how my supervised agentic workflow operates, and why AI-generated code still requires architecture, testing, independent review and real bench evidence.
-

Project sEVen pt 10: Project Update and Software re-write with AI
A detailed July update on the Purple Meanie Caterham Seven EV conversion, including the rebuilt VCU software, ESP32 web interface, updated bench hardware and live precharge demonstration.
-

Project sEVen Pt9: Traction DC2DC converter Bring Up
Project sEVen update covering traction DC-DC converter bring-up, high-voltage testing, low-voltage integration, CAN bus work, and the Caterham EV testbench.
-

GVRET and BDC668 Dissectors for Wireshark
Technical notes on GVRET and BDC668 Wireshark dissectors, using CAN bus tooling to inspect and understand Project sEVen diagnostic and power-electronics data.
-

Project sEVen pt8: Custom Gearbox Assembly – YOUTUBE VIDEO
Project sEVen gearbox assembly video covering the custom gearbox work, mechanical packaging decisions, and drivetrain context for the Caterham electric conversion.
-

Project sEven pt7 : Q&A and Weekly Updates
Project sEVen Q&A and weekly update video covering the mission, project feasibility, recent progress, and viewer questions around the Caterham EV conversion.
-

Putting the EV in Seven – Two Year Mega Update Video
Two-year Project sEVen update covering EV packaging, high-voltage and low-voltage systems, battery and motor-controller work, gearbox decisions, 3D scanning, and overall project progress.

