Category: Magazine Articles
-

Post-Post Build Check and a Dash for Fuel
Caterham 420R post-build update covering follow-up check work and the first dash for fuel before IVA.
-

Post Build Check
Caterham 420R post-build check covering inspection feedback and follow-up items after the main kit build was completed.
-

Build Session 37 : IVA Preparation and Tidy-ups
Final numbered Caterham 420R build session focused on IVA preparation and tidy-up work before inspection.
-

Build Session 36 : Repeaters, IVA, Mirrors, Wipers, Rear Hubs, Wings
Caterham 420R build session covering repeater lights, IVA preparation, mirrors, wipers, rear hubs, and wing work.
-

Build Session 35 : Front Wings, Handbrake Cable and Tidying Up
Caterham 420R build session covering front wing finishing, handbrake cable work, and general tidying before the final build stages.
-

Build Session 34 : Brake and Clutch Fillup/Bleed, Bonnet Collection and more Front Wings
Caterham 420R build session covering brake and clutch filling and bleeding, bonnet collection, and further front wing work.
-

Build Session 33 : Front Wings, Lights, Handbrake, Gearbox, Number Plate Light
Caterham 420R build session covering front wings, lighting, handbrake work, gearbox checks, and number plate light fitting.
-

Build Session 32 : LHS Indicators, Swap Wing Stays, Repeater Wiring
Caterham 420R build session covering left-hand indicator troubleshooting, swapped wing stays, and repeater wiring.
-

Build Session 31 : Rear Braided Brake Hose, Rear Lights, Front LHS Indicator Not Working
Caterham 420R build session covering rear braided brake hose fitting, rear lights, and troubleshooting a non-working front left indicator.
-

Build Session 30 : More Fuel and Washer Bottle Fitting
Caterham 420R build session covering further fuel-system work and washer bottle fitting.

